Safe and intact infrastructure is essential for a functional transport system. To ensure the safety and interoperability of infrastructure assets, the EC verification procedure is an integral part of the commissioning process.
The track-side control-command and signaling subsystem (CCS)
Homologation
Independent Safety Assessment (ISA)
Standard Conformity Assessment
Testing, calculation and simulation
Product inspection
Supervision and manufacturing
Reliability, Availability, Maintainability and Safety (RAMS)
Independent Verification and Validation (IV&V)
System assurance
Fire prevention and human factors engineering assessment
Electrical safety and protection
Kevin Liu
Director- RST& INF
Tel:+86-13564957803
E-mail:keliu@tuv-nord.com