Assessment of Investment Projects for Compliance with Energy Efficiency Requirements


prepares a report on the compliance or non-compliance of the project with energy efficiency requirements, in accordance with:
For completed buildings (before commissioning):
TÜV NORD Bulgaria prepares a report on compliance or non-compliance with energy efficiency requirements and prepares an energy certificate according to:
Energy audit of existing buildings (commissioned before or after 2005):
TÜV NORD Bulgaria prepares a report on the building’s energy performance based on operational energy consumption for heating, cooling, ventilation, domestic hot water, lighting, and appliances for all users of the building. The audit determines the building’s energy class and provides recommendations for energy-saving measures to improve the building’s energy class. A summary includes technical and economic indicators (costs, payback periods, etc.) for the proposed measures.
Additional incentives:
Applicable regulations for energy efficiency audits and certification:

13 Nayden Gerov St., 4000 Plovdiv, Bulgaria
Tel.: +359 32 624 243
bulgaria@tuev-nord.de